PASIR MAS: The government has approved an immediate allocation of RM6mil to construct a temporary embankment, including the spillway structure for the Sungai Golok Integrated River Basin Development Project, to solve the problem of stagnant floodwaters in Rantau Panjang.
Prime Minister Datuk Seri Anwar Ibrahim said that the temporary embankment needs to be constructed as soon as possible at three identified locations, with each location allocated RM2 mil.
Already a subscriber? Log in
Save 30% OFF The Star Digital Access
Cancel anytime. Ad-free. Unlimited access with perks.
