Inquiry into 2013 mishap at Menara Umno in Jalan Macalister blames engineers


GEORGE TOWN: The Commission of Inquiry into the failures of two civil structures in Penang has come down hard on the engineer who designed the fin wall atop the 21st storey of Menara Umno in Jalan Macalister.

The engineer, Lee Ah Yew, was "grossly incompetent and grossly negligent" and had committed multiple serious errors, which resulted in the reinforced-concrete structure weighing about 200 tonnes collapsing on June 13, 2013.

In its report, the three-member commission headed by Datuk Yeo Yang Poh said Monday that Lee, who designed the fin wall in 1995, was then a graduate engineer with no experience in designing a "slender" cantilever column on top of a tall building.

The commission has recommended that the Board of Engineers (BEM) initiate disciplinary action against Lee.

It said the board should also take disciplinary action against Dr Gerry Wong Kong Ming, the submitting engineer who signed and submitted the engineering drawings to the local planning authorities.

"As such, the errors and inadequacies in the design of the fin wall are deemed to be his; for which he must bear equal responsibility, though he signed them without checking," it said.

The commission rapped the North-East district officer Azizi Zakaria for abandoning his duties as the person in-charge of emergency responses under Arahan 20.

"His dereliction of duty was so complete and that it is difficult to imagine anyone who could have done worse.

"Encik Azizi's lack of remorse and contrition when he testified before the commission and his unabashed downplay of his total neglect of duty, are very much disturbing,” the report stated.

In the incident, the fin wall collapsed and hit a passing car and buried it (together with its driver) beneath the ground. A lorry attendant nearby was also killed. Several vehicles and properties were damaged.

The commission also submitted its findings into the ramp which collapsed on June 6, 2013 at the Batu Maung interchange leading to the second Penang Bridge.


Article type: metered
User Type: anonymous web
User Status:
Campaign ID: 46
Cxense type: free
User access status: 3

Penang , Structure failure , Menara Umno

   

Next In Nation

Covid-19: Five shuttlers test positive, Academy Badminton Malaysia shuts down
Durian trader claims cheated of over RM170,000 in investment scam
Fireworks worth over RM90,000 seized, three arrested in Senai
Tok Adis Ramadan bazaar ordered to close for violating SOP
Eight held over Raya-themed gambling ad
Covid-19: Healthcare workers infected after vaccination had less severe symptoms, says Health DG
Over 136,000 police retirees, ex-policemen eligible for one-off RM500 assistance
Police seeking information on Cheras restaurant fight
Long border closure with Singapore straining family ties, says group
Wee: KL Sentral to improve services to keep up with increasing capacity

Stories You'll Enjoy


Vouchers