Road barrier upsets Ulu Tiram farmers


Ng (centre, wearing glasses) and farmers at the barrier erected at the only road connecting the 100 farms and plantations in the Ulu Tiram area. — THOMAS YONG/The Star

Obstacle put up by developer makes it difficult for lorries to enter and exit area

FARMERS and smallholders near the Pulada Army camp in Ulu Tiram, Johor, are at their wits’ ends after a developer put up a barrier at the main entrance of the road.

They said the roadblock, which was erected over a year ago, made it difficult for vehicles to enter and exit the area after 6pm.

Chong Ah Kau, 77, who owns a durian orchard and an oil palm plantation in the area, said the barrier also made it difficult for farmers to collect their crops.

“I received a call once from a lorry driver who was unable to exit because of the barrier.

“When I called the person in charge of manning the barrier, he said he had left the site. The lorry driver ended up having to leave his vehicle, which was loaded with oil palm fruits, at the barrier.

“He had to return the next day to get the lorry out,” Chong told reporters at a press conference held opposite the Pulada Army camp.

He said there was only one road that connected the whole area, which had over 100 farms and plantations.

“I am worried that in case of an emergency, we cannot exit. We hope another road can be provided,” he said, adding that farm and plantation workers also lived in the vicinity.

The road leads to the land owned by the developer.

A. Govidersami, 72, who owns a 3.2ha oil palm plantation, said there was also ongoing work digging drains around the area.

“The digging work has made it very difficult for lorries to move around and pick up fruits.

“It is also very dangerous, especially when it rains.

“We are worried that if the situation persists, someone may end up getting injured,” said Govidersami.

Johor MCA secretary Datuk Ng Keng Heng said he would raise the matter with the relevant parties.

“We urge other farmers and smallholders affected by the situation to reach out to us.

“At the moment, we have identified 20 out of the 100 or so farmers and smallholders here.

“Once we get the numbers, we will have a meeting with the developer and the land office to find a solution to this problem,” said Ng, who is also Kota Tinggi MCA division chief.

He said smallholders and farmers could contact the Johor MCA office at 07-363 0008.

Get 20% OFF The Star Digital Access

Monthly Plan

RM 13.90/month

RM 11.12/month

Billed as RM 11.12 for the 1st month, RM 13.90 thereafter.

Best Value

Annual Plan

RM 12.33/month

RM 9.87/month

Billed as RM 118.40 for the 1st year, RM 148 thereafter.

Follow us on our official WhatsApp channel for breaking news alerts and key updates!
Smallholders , Farmer , Blockade , developer

Next In Metro News

Uncleared drains trigger Sepang flash floods
Highland Towers demolition stalled over formal application delay
Harvey Norman Mid Valley flagship store celebrates second anniversary
Age-old Perlis crafts live on
Sabak Bernam couple’s chips bring new hope
Charity to disburse RM800,000 to students, single parents, the elderly
Perak MACC strengthens prevention, outreach efforts
Bartenders from Malaysia, Indonesia battle for top spot
International chain opens new hotel in Permas Jaya
Orang Asli keeping traditional blowpipe craftsmanship alive

Air Pollutant Index

Note: API is calculated based on 24hr running average of the most dominant parameter.

Highest API Readings

    Select State and Location to view the latest API reading

    Others Also Read