WE refer to the letter in Star Metro titled “Plea for smart meters, ToU scheme in Negri Sembilan” (The Star, July 23; https://tinyurl.com/39vkjcfz).
Tenaga Nasional Berhad (TNB) would like to thank Muthukrishnan Murugiah for his feedback and for supporting the transition towards smarter energy use. His application to switch to the ToU (Time of Use) scheme was accepted on July 8. As he has a conventional meter installed at his premises, he was informed that the process of changing it to the smart meter before activating it with the ToU scheme would take up to two months.
Already a subscriber? Log in
Save 30% OFF The Star Digital Access
Cancel anytime. Ad-free. Unlimited access with perks.
