CIDB finds over 200 misused A-frame scaffolding rods at Cheras construction site


  • Nation
  • Wednesday, 01 Mar 2023

KUALA LUMPUR: An integrated operation carried out by the Construction Industry Development Board (CIDB), together with several enforcement agencies, at a construction site in Jalan Mutiara Barat, Cheras, found over 200 rods of misused prefabricated steel frame construction material scaffolding (A-frame).

Kuala Lumpur CIDB director Datuk S. Gerald said A-Frame scaffolding was a temporary structure that is crucial during the construction of a building.

The Star Christmas Special Promo: Save 35% OFF Yearly. T&C applies.

Monthly Plan

RM 13.90/month

Best Value

Annual Plan

RM 12.33/month

RM 8.02/month

Billed as RM 96.20 for the 1st year, RM 148 thereafter.

Follow us on our official WhatsApp channel for breaking news alerts and key updates!

Next In Nation

PAS sacks three assemblymen in Perlis
Male fertility issues account for nearly half of infertility cases, says specialist
Dr Wee extends Christmas greetings to Malaysian Christians
Missing 12-year-old boy in Taman Bukit Indah returns home safely
Two detained in connection with video of person in headscarf drinking alcohol
Body of man with multiple injuries found by roadside in Tangkak
Families gather in hometowns throughout Sarawak, Sabah ahead of Christmas Day
Last-minute Christmas prep underway across Malaysia
One dead, one injured in airport construction site accident
MACC seizes over RM6bil in funds through anti-graft efforts in 2025

Others Also Read