CIDB finds over 200 misused A-frame scaffolding rods at Cheras construction site


  • Nation
  • Wednesday, 01 Mar 2023

KUALA LUMPUR: An integrated operation carried out by the Construction Industry Development Board (CIDB), together with several enforcement agencies, at a construction site in Jalan Mutiara Barat, Cheras, found over 200 rods of misused prefabricated steel frame construction material scaffolding (A-frame).

Kuala Lumpur CIDB director Datuk S. Gerald said A-Frame scaffolding was a temporary structure that is crucial during the construction of a building.

Save 30% and win Bosch appliances! More Info

Monthly Plan

RM13.90/month
RM9.73 only

Billed as RM9.73 for the 1st month then RM13.90 thereafters.

Annual Plan

RM12.33/month
RM8.63/month

Billed as RM103.60 for the 1st year then RM148 thereafters.

1 month

Free Trial

For new subscribers only


Cancel anytime. No ads. Auto-renewal. Unlimited access to the web and app. Personalised features. Members rewards.
Follow us on our official WhatsApp channel for breaking news alerts and key updates!

Next In Nation

Speaker of Dewan Rakyat attends iftar event hosted by Cambodian PM in Phnom Penh
Federal Court Judge Harmindar Singh chairs 25-member committee reviewing outdated criminal laws
Third batch of 24 Malaysians rescued from Myanmar to be repatriated on Tuesday (March 25)
Customs foils drug smuggling attempts worth RM1.86mil at KLIA in two months
No road maintenance along Pan Borneo Highway during Aidilfitri
Malaysia must accelerate AI adoption for economic growth, says Anwar
Driver nabbed after video of ramming incident under flyover goes viral
Urban Renewal Bill takes centre stage at Insap's Civic Lens Series presentation, says Dr Wee
MCMC partnership effectively curbs religious insult cases, says IGP
Johor cops investigate assault caught on camera

Others Also Read