KUALA LUMPUR: To prepare for the full operation of the Putrajaya Mass Rapid Transit line, Rapid Rail Sdn Bhd (Rapid Rail), Mass Rapid Transit Corporation Sdn Bhd and its contractors will conduct a final trial run of the Putrajaya MRT line Phase Two from Tuesday (Nov 22) till Dec 18.
Rapid Rail said in a statement that the final trial run is a pre-condition set to measure and test system effectiveness before approval is given by the Land Public Transport Agency (Apad) for full operation of the line.