PASIR GUDANG: Contractors involved in the cleaning operation of Sungai Kim Kim have so far collected 1,250 tonnes of soil, water and sludge from the river.
Johor Health, Environment and Agriculture Committee chairman Dr Sahruddin Jamal said that 1.3km of the 1.5km polluted river has been cleaned up so far.
"The contractors have collected about 550 tonnes of soil and sludge and 700 tonnes of polluted water as of 4pm Saturday (March 16)," he said in a statement here Sunday (March 17).
Dr Sahruddin also said until midnight Saturday, 108 patients, who were warded at Sultanah Aminah Hospital, Sultan Ismail Hospital and Permai Hospital, have been discharged.
He added that about 143 patients were still being treated while 36 cases have been referred to hospitals outside Johor Baru and 29 cases to hospitals outside Johor.
"Seven patients are still being warded at intensive care units (ICU) but are in stable condition," he said.
Already a subscriber? Log in
Get 20% OFF The Star Digital Access
Cancel anytime. Ad-free. Unlimited access with perks.
