Aerotrain service at KLIA suspended due to technical problems


SEPANG: All Aerotrain operations at the Kuala Lumpur International Airport (KLIA) Main Terminal have been suspended until further notice, says Malaysia Airports Holdings Berhad (MAHB).

Its managing director Datuk Iskandar Mizal Mahmood said this was because the existing trains were constantly breaking down given that the assets are 25 years old.

"Aerotrain operations were suspended since the breakdown yesterday and we made the official announcement on Thursday (March 2).

"We truly apologise for the inconvenience caused but we had to take this decision as safety is our utmost priority," he told a press conference at KLIA on Thursday (March 2).

On the cause of the breakdown, Iskandar said it was due to its circuit breakers being tripped.

"This happened to the first train that broke down, with the second train (sent to ferry stranded passengers) also experiencing technical difficulties.

"These are, however preliminary findings, as we have to dismantle all parts of the train (including the platforms) to diagnose the real cause of the issue," he said.

He added that round-the-clock shuttle bus services would be provided to assist passengers heading towards the Satellite Building.

The max capacity for passengers for each bus was 40 at a time, he said.

Iskandar added that 114 passengers were stranded by the Aerotrain breakdown on Wednesday (March 1), resulting in them having to walk almost half a kilometre to the Satellite Building.

"Assistance was given where possible. The 10 passengers who missed their flights were also compensated with new flight tickets and accommodation," he said.

On Monday (Feb 27), an Aerotrain halted mid-way on the tracks from the KLIA Main Terminal Building to the Satellite Building.

A second train was immediately deployed for stranded passengers but it unfortunately experienced technical difficulties, resulting in passengers having to walk towards the Satellite Building.

Get 20% OFF The Star Digital Access

Monthly Plan

RM 13.90/month

RM 11.12/month

Billed as RM 11.12 for the 1st month, RM 13.90 thereafter.

Best Value

Annual Plan

RM 12.33/month

RM 9.87/month

Billed as RM 118.40 for the 1st year, RM 148 thereafter.

Follow us on our official WhatsApp channel for breaking news alerts and key updates!
Aerotrain , MAHB , KLIA , Breakdown , Terminal , Suspension ,

Next In Nation

Barisan is ‘colour blind’ in serving Johoreans, says Onn Hafiz
MetMalaysia warns of thunderstorms in nine states until 1am (June 30)
Malaysia must act to boost tech capabilities, cybersecurity, says Ahmad Zahid
12-year-old dies in croc attack
Govt committed to continuing sustainable development in all states
Not so fun-gi: Couple suffer severe food poisoning after eating wrong wild mushrooms
MMC calls for Parliamentary Select Committee review of new Cybercrimes Bill
Johor polls: Bersatu will not tell members to back Barisan in seats Perikatan is not contesting
EC issues 24,677 postal ballots papers for 16th Johor Election
One drowned in boat capsize incident off Pulau Sayak

Others Also Read