Approval for RM2bil flood mitigation project in accordance with regulations, says Tengku Zafrul


KUALA LUMPUR: Finance Minister Tengku Datuk Seri Zafrul Tengku Abdul Aziz says that all procurement related to the alleged approval of a flood mitigation project made after the dissolution of Parliament had been made in accordance with existing regulations.

PKR deputy president Rafizi Ramli had earlier claimed that the Environment and Water Ministry is in the process of awarding a RM2bil project through direct negotiations to Mangkubumi Sdn Bhd, which is said to be owned by a person with links to the Umno leadership.

The company is also said to have obtained the approval from Tengku Zafrul via a letter dated Oct 7, the day of the tabling of Budget 2023 in Parliament.

In a tweet on Twitter today, Tengku Zafrul issued a challenge to Rafizi to lodge a report to the Malaysian Anti-Corruption Commission (MACC) if there was evidence of violations, as well as present evidence and not wait after the 15th General Election (GE15) to take action.

Meanwhile, in Kuala Selangor, Tengku Zafrul said a task force involving relevant agencies such as the Irrigation and Drainage Department, state government and the Environment and Water Ministry will be established to find a solution to the flood issue in Kuala Selangor.

Tengku Zafrul, who is also a Barisan Nasional (BN) candidate for the Kuala Selangor parliamentary seat, said the flood issue in Kuala Selangor requires a holistic approach so that it can be effectively overcome.

He said in Budget 2023 that he had presented last month, the federal government had expressed its commitment to overcome flood issues by allocating RM15bil for flood mitigation projects.

"This project is now in the evaluation phase for the purpose of appointing a contractor, however, this flood situation also involves the issue of maintaining the drainage system. Through a study by an independent body it was found that as much as 30% of this issue is caused by drains and ditch systems that are clogged due to garbage and not maintained as scheduled," he said.

Tengku Zafrul said this to Bernama when met after visiting the flood relief centre (PPS) at Sekolah Menengah Kebangsaan Jeram here on Saturday (Nov 12).

A total of 32 victims from six families were placed at the PPS this morning. - Bernama

Follow us on our official WhatsApp channel for breaking news alerts and key updates!
   

Next In Nation

Indonesian man nabbed with drugs worth RM110,000 in Perak
Malaysian Harvard law student wins prestigious US award for helping poor clients
Papagomo's representation to drop sedition charge dismissed, Trial on July 11
Wild party at Terengganu resort, owner issued compound of RM25,000
Diesel subsidies cost govt RM1bil a month, losses RM4.5mil a day, says minister
Pulau Gaya islanders catch 200kg croc lurking off KK city waters
Fuel subsidy details missing from PM's speech, says Hamzah
Diesel subsidy rationalisation to be done this year, says Domestic Trade Minister (Poll Inside)
State education department to closely track kids to ensure they get an education, says Johor exco
Perlis MB's son pleads not guilty to charge of submitting false claims

Others Also Read