Construction work, electrical and mechanical wiring form bulk of Seri Perdana repairs, says Muhyiddin


PETALING JAYA: Extensive repair work had to be carried out at the Prime Minister’s official residence in Putrajaya due to physical and electrical damage at the building, says Tan Sri Muhyiddin Yassin.

He clarified that the repairs at Seri Perdana were approved during his administration when he was the prime minister.

He said when he was appointed prime minister in March 2020, he received a report from the Prime Minister’s Department that there was physical damage in Seri Perdana.

“These damage comprised leaks, old lighting systems as well as the flooring and roof that were either damaged or worn out.

“The leaks in the Seri Perdana roof and the piping system had damaged the built-in furniture, wooden flooring, wall panels and the building’s ceiling.

“I was also informed that the electrical wiring, lighting and other equipment such as the air-conditioners also needed to be repaired as they were too old,” he said in a Facebook post on Thursday (Sept 30).

Muhyiddin said that construction experts had said that the wiring system in the Seri Perdana building was more than 20 years old and could pose a fire risk if they were not immediately repaired.

As such, he said the bulk of the cost at Seri Perdana involved construction work, electrical and mechanical wiring.

“The size of the Seri Perdana complex, which covers an area of more than 56,000 sq feet, was also why the cost of repairing the government-owned building was quite high.

“The decision to renovate Seri Perdana was made to preserve the government-owned building to its original condition as it is the symbol of the institution of the head of government and the country’s image.

“If the building is not repaired immediately, the government heritage building will suffer more severe damage in the future and this will increase the cost of repairs,” he added.

Muhyiddin noted that the repair works were closely monitored by a task force consisting of officers from the Public Works Department (PWD) and the Prime Minister’s Department.

“I believe that the PWD and the Prime Minister’s Department, which are directly involved in the refurbishment of Seri Perdana, have detailed information on the implementation of this project.

“In line with the principles of transparency and integrity practised by the government, the relevant departments can come forward to provide clarification to the public on this matter,” Muhyiddin said.

He also disclosed that he had never stayed at Seri Perdana during his tenure as prime minister.

Get 20% OFF The Star Digital Access

Monthly Plan

RM 13.90/month

RM 11.12/month

Billed as RM 11.12 for the 1st month, RM 13.90 thereafter.

Best Value

Annual Plan

RM 12.33/month

RM 9.87/month

Billed as RM 118.40 for the 1st year, RM 148 thereafter.

Follow us on our official WhatsApp channel for breaking news alerts and key updates!

Next In Nation

NGO: Govt must take proactive steps against cyber threats
Borrowing not a sustainable solution to money problems
Easy loans are not an ATM
New Bill provides more bite against AI cybercrime
MCMC on higher alert
Europe cyber attacks a timely lesson for Malaysia’s food supply chain, says expert
Cheras cops nab man accused of slapping, threatening victim with knife
Traffic smooth on all major highways tonight, says LLM
AGC to seek review of Da'i Syed's acquittal on rape charge
Use Deepavali celebration to foster peace, harmony, Anwar urges Malaysians

Air Pollutant Index

Note: API is calculated based on 24hr running average of the most dominant parameter.

Highest API Readings

    Select State and Location to view the latest API reading

    Others Also Read