Fast track: IBS high-rise buildings are built at a speed of one floor per week, effectively saving 12 months in construction time.
KUALA LUMPUR: Houses built with the Industrialised Building System (IBS)? Think Lego blocks.
IBS technology today is not limited to standard prefabricated panels that can make a house look boxy, a common misconception among people unfamiliar with IBS homes.