ADVERTISEMENT

Creative designs the IBS way


Fast track: IBS high-rise buildings are built at a speed of one floor per week, effectively saving 12 months in construction time.

Fast track: IBS high-rise buildings are built at a speed of one floor per week, effectively saving 12 months in construction time.

KUALA LUMPUR: Houses built with the Industrialised Building System (IBS)? Think Lego blocks.

IBS technology today is not limited to standard prefabricated panels that can make a house look boxy, a common misconception among people unfamiliar with IBS homes.

   

ADVERTISEMENT