MAINTENANCE works have been carried out by Tenaga Nasional Bhd (TNB) on power lines to ensure uninterrupted electricity supply to millions across peninsular Malaysia.
The national power provider’s grid team recently carried out works along a 132 kilovolts (kV) transmission line in Skudai, using the live method without shutting down the power supply.
