Floating mosque 60% complete


Abang Johari taking a closer look at the construction being done at the project site.

KUCHING: Sarawak’s first floating mosque at the Kuching Waterfont, once completed this September, will be a unique addition that will further boost tourism at the city centre.

The over RM10mil project is currently at 60% completion but Sarawak Chief Minister Datuk Patinggi Abang Johari Tun Openg has already envisioned a future where the mosque becomes a popular tourism attraction.

The project, situated at the Old Kuching town of Gambier Street and not far from the iconic Darul Hana Bridge and Sarawak Legislative Assembly Complex, will also see the expansion of the waterfront to connect with the Kuching Esplanade.

Abang Johari said the future project would see the waterfront expanding towards Brooke Dockyard and the old state mosque.

“The floating mosque has a unique architectural design and will be different from other mosques that we have built.

“Some of the design has architecture elements from mosques in Turkey,” he told reporters after a site visit to look at its progress on Tuesday.

Abang Johari visiting the floating mosque project site to check on the building’s progress. — Photos: ZULAZHAR SHEBLEE/The Star
Abang Johari visiting the floating mosque project site to check on the building’s progress. — Photos: ZULAZHAR SHEBLEE/The Star

Abang Johari said the floating mosque would have a capacity of about 1,000 people.

He expressed hope that the mosque would open its doors to the public as soon as this year.

Touching on the waterfront project on the opposite side of the Sarawak River, the chief minister said plans were afoot to expand the waterfront from Kampung Sungai Bedil to Kampung Tanjung within the next two years.

To further beautify the riverbanks at the Sarawak Legislative Assembly Complex area, the government has embarked on a project to build a walkway together with musical water fountains and colourful light display as another attraction in the area.

Abang Johari said the fountain will be programmed to put on a show periodically throughout the evening.

“The musical fountain project is also targeted to be completed this September. This structure will be a new attraction that will benefit the city area, including the Main Bazaar and Gambier Street, all the way to Market Street,” he continued.

Get 20% OFF The Star Digital Access

Monthly Plan

RM 13.90/month

RM 11.12/month

Billed as RM 11.12 for the 1st month, RM 13.90 thereafter.

Best Value

Annual Plan

RM 12.33/month

RM 9.87/month

Billed as RM 118.40 for the 1st year, RM 148 thereafter.

Follow us on our official WhatsApp channel for breaking news alerts and key updates!

Next In Metro News

Gourmet awards introduces new taste category
Electric beats, pink glow rock KL
Activist: Allow U-turn on Kepong Baru road to save time
Crowds throng beverage fest at Alor Setar mall
Superhero excitement at KL cinema launch
New four-lane road to ease Taman Kinrara traffic
A taste of Anatolian awaits
RTS link sparks business boom
New MBSJ complex to be Sukma sepak takraw venue
Full steam ahead for school shirts

Others Also Read