KUALA LUMPUR: Malaysia Marine and Heavy Engineering Holdings Bhd
(MMHE) has secured a contract from Petronas Carigali Sdn Bhd for the Bekok oil project and another from Hess Exploration and Production Malaysia B.V.
MMHE said on Monday the contract from Petronas Carigali to provide engineering, procurement, construction, installation and commissioning for the Bekok oil project.
It said the job scope included installatinh new BEDP-A and BEDP-B wellhead platforms linking each of the topside to the existing Bekok-A and Bekok-B platforms respectively.
The fabrication works are to be completed in nine months until the ready-for-rig stage.
Upon completion of fabrication works, the platforms will be installed at PM9 Field in southeastern of Malay Basin, Peninsular Malaysia, about 260km from Terengganu Crude Oil Terminal.
MMHE also recently secured a contract for the Bergading central processing platform-mercury removal unit (CPP-MRU) integration project from Hess.
It covers engineering, procurement, construction and commissioning (EPCC) works for Bergading MRU module.
Upon completion the module will be installed and integrated to the existing Bergading CPP, North Malay Basin.
MMHE managing director and CEO Wan Mashitah Wan Abdullah Sani, said these new contracts signify continued trust of its clients in our capability in providing innovative solutions with the highest standard of safety, quality, time and cost.
“Our focus remains to ensure efficiency and effectiveness in the execution of project deliverables as per targets set, ” he said.
Already a subscriber? Log in
Get 20% OFF The Star Digital Access
Cancel anytime. Ad-free. Unlimited access with perks.
