Two top execs at scandal-hit Japan nuclear plant operator resign


Chubu Electric Power President Kingo Hayashi (front) and other executives bowing during a press conference over a data manipulation scandal involving earthquake assessment data for the Hamaoka nuclear power plant, in Nagoya, Aichi prefecture on Sept 14, 2026. - AFP

TOKYO: Two top executives at a Japanese nuclear plant operator stepped down Monday (Sept 14) following a quake data-tampering scandal, and the firm said it will abandon plans to restart two reactors.

Japan is moving to revive nuclear power 15 years after an enormous earthquake and tsunami sent reactors at the Fukushima atomic plant into meltdown in 2011.

Chubu Electric Power's Hamaoka nuclear plant -- located in an area of central Japan at risk of a potential "megaquake" -- has been undergoing regulatory safety checks, with the aim of restarting two reactors.

But in January, the operator said that it had submitted data to regulators that underestimated earthquake risks.

Chubu Electric said in a statement Monday that president Kingo Hayashi and chairman Satoru Katsuno would be replaced and the firm would withdraw applications to restart the reactors at Hamaoka.

Hayashi told a news conference that he felt "a heavy sense of responsibility and am deeply remorseful".

He said he felt "a profound sense of regret" that he was unable to "foster an organisational culture that prioritises compliance and safety above all else".

A 250-page report by an independent panel, released on Monday, said the management's "reprimand" over delays in the restart review had created pressure on staff, and was "one of the factors contributing to the misconduct".

Japan pulled the plug on nuclear power in the wake of the meltdown at the Fukushima atomic plant.

However, the resource-poor nation now wants to revive atomic energy to reduce its heavy dependence on fossil fuels, achieve carbon neutrality by 2050 and meet growing energy needs from artificial intelligence.

The world's biggest nuclear plant, Kashiwazaki-Kariwa, restarted operations earlier this year.

The estimate of maximum seismic ground motion is important for the earthquake-resistant design of nuclear plants.

In September 2023, the Nuclear Regulation Authority approved Chubu's estimate of 1,200 gal, a unit of acceleration used to measure the intensity of quakes.

But in February last year, the NRA received information about possible data fraud from a whistleblower.

The NRA suspended its safety review process for the Hamaoka plant in late December.

The plant is located in Omaezaki, Shizuoka prefecture, near a seismic fault line where a massive Pacific earthquake is expected to occur in the coming years or decades.

In 2024, the Japan Meteorological Agency issued its first special advisory for a possible "megaquake" in the area, known as the Nankai Trough, before lifting it a week later. - AFP

 

 

Follow us on our official WhatsApp channel for breaking news alerts and key updates!
Japan , nuclear , scandal , quake , data-tampering , Hamaok , reactor , Chubu

Next In Aseanplus News

Heavy vehicles to be allowed to park overnight at Singapore's industrial, commercial and work sites from Sept 15
Prabowo replaces Finance Minister Purbaya in long-awaited Indonesian Cabinet shake-up
Malaysia Day exhibition expanded to digital platforms, promotes MA63 as national narrative
More international flight options for Malaysian travellers
Flash foods force evacuation of 2,500 people in central province of Quang Tri
Vietnamese couple nabbed in Ampang for offering illegal immigration services
Cluster Munitions Review Conference opens in Vientiane
Negri royal row: Signing document to depose Ruler an act of treason, says DKU
Australia’s far-right leader vows to cut migrants by 750,000
Cyber insurance gains ground in Singapore as coverage widens, premiums fall

Others Also Read