KOTA KINABALU: Load-shedding is currently ongoing in Sabah due to an insufficient power supply and critical reserve margins currently in the state.
Sabah Grid System Operator managing director Adrian Mosigil, said that this is due to inspection and repair works on two of the main independent power producers (IPPs),
Already a subscriber? Log in
Get 20% OFF The Star Digital Access
Cancel anytime. Ad-free. Unlimited access with perks.
