Developer ordered to stop work after house collapses in Cheras


A DEVELOPER has been ordered to stop construction on a highrise project after a two-storey house in Taman Pertama, Cheras was destroyed.

Kuala Lumpur City Hall (DBKL) said this occurred after a retaining wall at the project site shifted on Sunday (May 22).

In a statement on Monday (May 23), DBKL also said the Fire and Rescue Department ordered the occupants of six nearby houses to vacate.

Kuala Lumpur mayor Datuk Seri Mahadi Che Ngah said the developer had been ordered to immediately fortify the retaining wall.

ALSO SEE: Landslide destroys house in Cheras, eight other homes deemed unsafe

"The Malaysian Institute of Public Works has been appointed as a consultant to oversee the work.

"The developer is also required to review the design of the retaining wall.

"They must also come out with a long-term proposal to solve the problem," he said during a press conference on Monday.

Mahadi said the timeline for completion had yet to be decided as relevant details were still being gathered.

"This includes data on project designs as well as the construction sequence at the site," he noted.

He also said that electricity and water supply to affected homes had been discontinued over safety concerns.

Residents of the six houses have been relocated to a nearby hotel with the cost borne by the developer.

Get 20% OFF The Star Digital Access

Monthly Plan

RM 13.90/month

RM 11.12/month

Billed as RM 11.12 for the 1st month, RM 13.90 thereafter.

Best Value

Annual Plan

RM 12.33/month

RM 9.87/month

Billed as RM 118.40 for the 1st year, RM 148 thereafter.

Follow us on our official WhatsApp channel for breaking news alerts and key updates!

Next In Metro News

Assess proposed Bkt Jalil development alongside existing, underway projects in neighbouring areas
25 high-risk trees being felled
Lack of urgency a problem
Competitive clean-up nets 371kg of waste in Pantai Bagan Lalang
Larkin Sentral gets RM5mil for repairs
Flames and lions roar in dazzling Penang parade
Perks from MBDK for new traders at Port Klang’s centralised hawker site
Buyers of abandoned Kulai project urged to meet liquidator tomorrow
South Korean boy band singer keen to learn Mandarin
Captivating craft of kokedama

Air Pollutant Index

Note: API is calculated based on 24hr running average of the most dominant parameter.

Highest API Readings

    Select State and Location to view the latest API reading

    Others Also Read