Unloading of the first Siemens SGT5-8000H gas turbine from the ship onto the dock of the Tanjung Setapa Material Offloading Facility on June 6. A total of four SGT5-8000H gas turbines will be installed at Petroliam Nasional Bhd’s (Petronas) Pengerang cogeneration power plant.