Laos' historic passenger train named Lane Xang to arrive on Oct 15


The design of the Lane Xang train. - Lao-China Railway Company

VIENTIANE (Vientiane Times/Asia News Network): The first passenger train to run on the Laos-China railway, which is scheduled to open on Dec 2, is expected to arrive in Vientiane on Friday (Oct 15).

The Prime Minister’s Office on Monday issued a notice that named the historic passenger train ‘Lane Xang’ – Laos’ former name when the country was known as the Lane Xang (million elephants) kingdom.

Laos and China have agreed to inaugurate the railway, which links Vientiane with the Chinese border, on Dec 2 - the day when the Lao People’s Democratic Republic celebrates its 46th anniversary.

The second passenger train that the Laos-China Railway Company plans to buy is named ‘Khaenlao’, after the khaen, which is a traditional pipe instrument whose music was inscribed as an Intangible Cultural Heritage of Humanity by the United Nations Educational, Scientific and Cultural Organisation (Unesco).

Prime Minister Phankham Viphavanh confirmed last week that the Laos-China Railway will open on Dec 2 despite the escalating Covid-19 outbreak.

Authorities are drawing up plans for the opening and operation of the railway under conditions that comply with virus control measures, to ensure the safety of everyone concerned.

The plan will look at how tourism services can be offered along with measures to be introduced at the Laos-China border for the inspection of goods and passengers prior to entry and exit.

It is expected that the railway will cut the cost of transport through Laos by 30-40 percent compared to travel by road, thus giving a boost to trade and investment.

Construction of the US$5.986 billion railway began in December 2016.

The 422.4-km railway runs from Vientiane to the Chinese border through the provinces of Vientiane, Luang Prabang, Oudomxay and Luang Namtha, passing through 75 tunnels with a combined length of 197.83km.

There are 10 passenger stations in Vientiane, Phonhong, Vangvieng, Kasy, Luang Prabang, Nga, Xay, Namor, Nateuy and Boten. There are also 22 stations for the loading and unloading of freight.

Get 20% OFF The Star Digital Access

Monthly Plan

RM 13.90/month

RM 11.12/month

Billed as RM 11.12 for the 1st month, RM 13.90 thereafter.

Best Value

Annual Plan

RM 12.33/month

RM 9.87/month

Billed as RM 118.40 for the 1st year, RM 148 thereafter.

Follow us on our official WhatsApp channel for breaking news alerts and key updates!
Laos , China , train , railway , Lane Xang , launch

Next In Aseanplus News

Asean news headlines as at 10pm on Tuesday (July 21)
Negri polls: Anwar to campaign at four locations on July 22
Opposition leader Rahul Gandhi demands India PM's resignation over student protest crackdown
Sara Duterte impeachment trial: NBI director called to the stand
Thousands protest in India after clashes, despite Modi assuring action on exams
Cambodian foreign minister urges Asean counterparts to support return of displaced civilians
Indonesia cuts budget of president's free meals programme further to US$12.8bil
Danang nighttime skies to glow with first-ever event featuring 500 illuminated kites
Asean weighs benchmarks, longer-term envoy to revive stalled Myanmar peace plan
A real-life 'Her'? S. Korea launches first dating reality show with AI partners

Others Also Read