THE flash floods in Baling recently caused a shutdown of the Sungai Dua Water Treatment Plant (WTP), the largest WTP which supplies 80% of the total volume of treated water to Penang.
It was reported that the raw water from Sungai Muda turned too turbid, resulting in a shutdown of almost four hours.
Already a subscriber? Log in
Get 20% OFF The Star Digital Access
Cancel anytime. Ad-free. Unlimited access with perks.
