Long awaited pedestrian bridge Saloma Link opens today


Artwork: The Saloma Link will easily be the country’s most iconic pedestrian bridge, with a design that combines aesthetic appeal with natural ventilation and lighting.
KUALA LUMPUR: Walkability in the city will get a huge boost when the Saloma Link, a new pedestrian bridge, opens at 2.30pm today.

The link offers a seamless connection between Kampung Baru and Jalan Ampang, at a spot near KLCC.

The link was commissioned by the Kampung Bharu Development Corporation (PKB).

Kampung Baru and the KLCC area are separated by the Klang river, and the six-lane Ampang-Kuala Lumpur Elevated Highway (Akleh).

With the Saloma Link, there is now seamless pedestrian connectivity between the old and new parts of Kuala Lumpur.

In an earlier interview with Bernama, PKB chief executive officer Zulkurnain Hassan said the Saloma Link stretches for 370m, but the span that crosses the highway and river is 69m long.

Though not exceptionally long by modern standards, construction of the steel bridge faced many technical and logistical challenges, as it has to cross an expressway, which has to be kept open.

The two piers of the bridge are also sunk within the protection zones of the Kelana Jaya LRT line tunnels, which rules out the use of heavy machinery, while requiring excavation by hand to minimise vibrations.

Other obstructions that had to be overcome include the water pipes along Akleh, the vehicular tunnel from Akleh to KLCC, as well as LRT tunnel ventilation shaft.

Built at a cost of RM31mil (including consultancy costs), the link starts from Lorong Raja Muda Musa 3, about 100m from the underground Kampung Baru LRT station, and is connected with Lorong Saloma, besides Menara Public Bank on the Jalan Ampang side.

Construction of the walkway took about 18 months.

The bridge’s architecture is inspired by the sireh junjung (betel nut leaf arrangement) concept, which is an integral part of a Malay wedding.

“The sireh junjung is among many other Malay-centric design ideas that we proposed to the client,” said Azril Amir Jaafar, principal at the Veritas Design Group, the company that is not only involved in designing the aesthetics of Saloma Link, but is also extensively involved in the master plan for the Kampung Baru redevelopment.

The Saloma Link is an integral part of making the city more walkable.

“On foot, it normally takes more than 30 minutes to get from KLCC to Kampung Baru, and across several busy roads.

“With the bridge, it will take pedestrians about seven minutes to get from Jalan Saloma to Jalan Raja Muda Musa 3,” said Zulkurnain.

The Saloma Link is probably the only facility that has a purpose-built slot along the stairways to facilitate those pushing their bicycles as they walk up the stairs on the Kampung Baru side, in addition to a lift.

Over at Jalan Ampang side, a smooth ramp promises universal access to all.

But the bridge will not be open round-the-clock to prevent vandalism.

PKB is likely to follow the operating hours of the Kelana Jaya LRT, which ends near midnight.

Get 20% OFF The Star Digital Access

Monthly Plan

RM 13.90/month

RM 11.12/month

Billed as RM 11.12 for the 1st month, RM 13.90 thereafter.

Best Value

Annual Plan

RM 12.33/month

RM 9.87/month

Billed as RM 118.40 for the 1st year, RM 148 thereafter.

Follow us on our official WhatsApp channel for breaking news alerts and key updates!
Saloma Link , pedestrian bridge

Next In Nation

Johor polls: Higher voter turnout will give the winner a stronger mandate, says Maszlee
Student falls from third floor of Kedah school
Thailand to open new border crossing with Malaysia to boost trade, logistics, and tourism
Durian Tunggal fatal shooting: Explain eight-month prosecution delay, Gobind told AG
Kuala Terengganu MP admitted to IJN following health issues in Parliament
Johor polls: Early voter turnout at 94.49pc, says EC
Johor polls: KTMB offers additional 7,464 ETS tickets with 20% discounts
Actress held after allegedly testing positive for meth in KL entertainment outlet raid
Act amendments in the works to resolve Felda second-generation housing crisis, says PM
Johor polls: Strong transportation demands encouraging sign of voter turnout

Others Also Read