Getting updated: Tan (second left) with Barisan coordinators and leaders inspecting the second Penang bridge.
THE ‘slightly curvy’ design of the second Penang bridge is for the safety of road users.
Jambatan Kedua Sdn Bhd construction director Hamizol Ngah said the 24km bridge from Batu Kawan to Batu Maung was constructed with a curvature for “technical reasons”.
