PETALING JAYA: Zelan Bhd
unit Zelan Construction Sdn Bhd (ZCSB) has received a contract from the East Coast Economic Region Development Council for the construction of the RM248.73mil drawbridge connecting Muara North and Muara South in the Kuala Terengganu city centre.
The overall length of the bridge is 632 metres, with a width of 23 metres.
Already a subscriber? Log in
Save 30% OFF The Star Digital Access
Cancel anytime. Ad-free. Unlimited access with perks.
