The property will be the third landside hotel at Changi Airport and will be built above the coach stand at the southern end of the newly reopened T2. - ST
SINGAPORE: A new hotel with at least 220 rooms will be built at Changi Airport Terminal 2 by 2027 to cater to an expected growth in passenger traffic.
This will be the third landside hotel at the airport, and it will be built above the coach stand at the southern end of the newly reopened T2.
Already a subscriber? Log in
Save 30% OFF The Star Digital Access
Cancel anytime. Ad-free. Unlimited access with perks.
