HARARE, March 19 (Xinhua) -- Zimbabwe's power utility, ZESA Holdings, will start synchronizing into the national grid the first of two generators being installed by a Chinese firm at Hwange Thermal Power Station Monday, in a move that will ease power shortages in the country.
The 300-MW unit is part of two generators making up the Hwange Thermal Power Station Unit 7 and 8 Expansion Project being undertaken by Sinohydro under a facility from China Eximbank.
Already a subscriber? Log in
Save 30% OFF The Star Digital Access
Cancel anytime. Ad-free. Unlimited access with perks.
