JAKARTA, July 15 (Xinhua) -- The first catenary cantilever was installed Friday in the section of Tegal Luar Station of the Jakarta-Bandung High-Speed Railway (HSR), marking the start of catenary construction in the important railway project in Indonesia.
A statement released by KCIC, a joint venture consortium between Chinese and Indonesian state-owned firms that runs the 142.3-km railway, said the integration of telecommunications, signaling, power and electrification of Jakarta-Bandung HSR is technically designed with "China Standard" and will be furnished with equipment manufactured in China.
Already a subscriber? Log in
Save 30% OFF The Star Digital Access
Cancel anytime. Ad-free. Unlimited access with perks.
