Tanco signs deal for EPC work on container port


PETALING JAYA: Tanco Holdings Bhd has entered into a heads of agreement (HoA) with CCCC Dredging Southeast Asia Sdn Bhd (CDSA) to detail further aspects of the development of a proposed smart container port in Port Dickson, Negri Sembilan.

In a statement, Tanco said the non-binding agreement establishes the framework for consideration of CDSA’s appointment as the engineering, procurement and construction (EPC) contractor for the port.

“The EPC work carries a maximum contract value of RM3.53bil, subject to final design, costing, and commercial terms.

“The sea port component is expected to be constructed within three and a half years once work commences.”

CDSA is a wholly owned subsidiary of CCCC Dredging Group Co Ltd, known globally for major marine engineering work including Yangshan Deep-Water Port and Colombo Port City.

The agreement requires CDSA to prepare detailed engineering studies, reclamation and piling methodologies, marine structure designs, costing supported by external benchmarking, and compliance plans aligned with Malaysian and international port standards. These are to be developed and finalised within the stipulated time.

Follow us on our official WhatsApp channel for breaking news alerts and key updates!
Tanco , EPC , container

Next In Business News

Theta Edge inks MoU to explore Hajj tech rollout in Indonesia
Ringgit revisits 3.95 against greenback on US-Iran talks hopes
Muhibbah Engineering wins RM120mil Penang LRT contract
Ocean Fresh receives additional tax assessments
Paos lodges proof of debt amounting to RM16.10mil
M'sia to increase biodiesel blend mandate from B10 to B15, says Economy Minister
AMS Advanced Material IPO oversubscribed 9.03 times
TDM unit to build, sub-lease RM72mil Tawau hospital expansion
FBM KLCI lifted by banking stocks amid regional rally
Malaysia raises May crude palm oil reference price, duty at 10%

Others Also Read