Meta's nuclear deal signals AI's growing energy needs


Facebook owner Meta announced on June 3, 2025, a 20-year nuclear energy agreement with US-based Constellation Energy to secure power from a nuclear plant in the state of Illinois. The investment marks big tech's latest move to meet surging electricity demand from AI, with Microsoft, Google and Amazon also turning to nuclear power as an energy source. — AFP

Meta's deal to help revive an Illinois nuclear power plant was one way of signaling that the parent company of Facebook and Instagram is preparing for a future built with artificial intelligence.

Meta's 20-year deal with Constellation Energy follows similar manoeuvres from Amazon, Google and Microsoft, but it will take years before nuclear energy can meet the tech industry's insatiable demand for new sources of electricity.

AI uses vast amounts of energy, much of which comes from burning fossil fuels, which causes climate change. The unexpected popularity of generative AI products over the past few years has disrupted many tech companies' carefully laid plans to supply their technology with energy sources that don't contribute to climate change.

Even as Meta anticipates more nuclear in the future, its more immediate plans rely on natural gas. Entergy, one of the nation’s largest utility providers, has been fast-tracking plans to build gas-fired power plants in Louisiana to prepare for a massive Meta data center complex.

Is the US ready for nuclear-powered AI?

France has touted its ample nuclear power – which produces about 75% of the nation's electricity, the highest level in the world – as a key element in its pitch to be an AI leader.

Hosting an AI summit in Paris earlier this year, French President Emmanuel Macron cited President Donald Trump’s "drill baby drill” slogan and offered another: "Here there’s no need to drill, it’s just plug baby plug.”

In the US, however, most of the electricity consumed by data centers relies on fossil fuels – burning natural gas and sometimes coal – according to an April report from the International Energy Agency. As AI demand rises, the main source of new supply over the coming years is expected to be from gas-fired plants, a cheap and reliable source of power but one that produces planet-warming emissions.

Renewable energy sources such as solar and wind account for about 24% of data center power in the US, while nuclear comprises about 15%, according to the IEA. It will take years before enough climate-friendlier power sources, including nuclear, could start slowing the expansion of fossil fuel power generation.

A report released by the US Department of Energy late last year estimated that the electricity needed for data centres in the US tripled over the past decade and is projected to double or triple again by 2028 when it could consume up to 12% of the nation’s electricity.

Why does AI need so much energy?

It takes a lot of computing power to make an AI chatbot and the systems they're built on, such as Meta's Llama. It starts with a process called training or pretraining – the "P” in ChatGPT – that involves AI systems "learning” from the patterns of huge troves of data. To do that, they need specialised computer chips – usually graphics processors, or GPUs – that can run many calculations at a time on a network of devices in communication with each other.

Once trained, a generative AI tool still needs electricity to do the work, such as when you ask a chatbot to compose a document or generate an image. That process is called inferencing. A trained AI model must take in new information and make inferences from what it already knows to produce a response.

All of that computing takes a lot of electricity and generates a lot of heat. To keep it cool enough to work properly, data centers need air conditioning. That can require even more electricity, so most data centre operators look for other cooling techniques that usually involve pumping in water. – AP

Follow us on our official WhatsApp channel for breaking news alerts and key updates!

Next In Tech News

Exclusive-Google works to erode Nvidia's software advantage with Meta's help
Brazil to get satellite internet from Chinese rival to Starlink in 2026
US gaming platform Roblox pledges changes to get Russian ban lifted
Oracle's $10 billion Michigan data center in limbo after Blue Owl funding talks stall, FT reports
Coursera to buy Udemy, creating $2.5 billion firm to target AI training
Factbox-By the numbers: How the Netflix and Paramount bids for Warner Bros stack up
Warner Bros Discovery board rejects rival bid from Paramount
Analysis-Qatar bets on cheap power to catch up in Gulf AI race
Analysis-Crypto investors show caution, shift to new strategies after crash
OpenAI’s ChatGPT updated to�make images better and faster

Others Also Read