WARSAW, March 3 (Xinhua) -- A contract for the design and operation of two large-scale energy storage projects in Poland has been signed between Greenvolt Power, a subsidiary of Portugal's Greenvolt Group, and Chinese firm BYD Energy Storage.
The first phase of the projects, which have a total capacity of 1.6 GWh, is already underway, with substation infrastructure under construction. The two storage facilities, located in Turosn Koscielna and Nowa Wies Elcka, are expected to be operational in 2028.
