RM168.7mil will be spent to address traffic congestion at Johor’s CIQs


Johor Mentri Besar Datuk Onn Hafiz Ghazi (right) describing the traffic congestion situation to Home Minister Datuk Seri Saifuddin Nasution Ismail (second from left) and Works Minister Datuk Seri Alexander Nanta Linggi (far left) during their visit to the Bangunan Sultan Iskandar CIQ in Johor Baru on Oct 11, 2023.

JOHOR BARU: Projects worth more than RM168.7mil will be carried out at both of Johor’s customs, immigration and quarantine (CIQ) complexes to address the traffic congestion issues, says Datuk Seri Fadillah Yusof.

The Deputy Prime Minister said the projects include adding 44 MBIKE lanes at the Bangunan Sultan Iskandar (BSI) and Kompleks Sultan Abu Bakar (KSAB) CIQs, costing about RM61.7mil.

“Statistics showed that 71 million people used both CIQs last year since border travel resumed on April 1, 2022," he said.

“For this year, about 98 million people have used both CIQs as of September, and we expect the figures to hit 136 million by the end of 2023,” added Fadillah.

He said this after chairing a meeting with a special committee to address the traffic congestion issues at both checkpoints at BSI here on Wednesday (Oct 11).

Fadillah attended the meeting virtually while Home Minister Datuk Seri Saifuddin Nasution Ismail, Works Minister Datuk Seri Alexander Nanta Linggi and Johor Mentri Besar Datuk Onn Hafiz Ghazi were present.

The Deputy Prime Minister said 21 initiatives had been planned to tackle the traffic congestion, and 15 of them had been completed while the rest are still ongoing as of Oct 10.

“Looking at the current and future needs, the committee has decided to add another four initiatives to set up more MBIKE lanes, construct a covered walkway on the Causeway and provide incentives for immigration officials on duty.

“We also agreed to merge the immigration clearance halls as well as upgrade and build new facilities at KSAB with a cost of RM106.9mil,” he added.

Before the meeting, the ministers, Onn Hafiz and the relevant government agencies visited the immigration clearance areas for pedestrians and vehicles to inspect the condition.

The MBIKE system was introduced in 2016 to help reduce congestion at entry points between Malaysia and Singapore by up to 50%.

It is similar to the autogates placed at all entry and exit points in Malaysia.

The system uses a radio frequency identification device (RFID) sticker attached to the holder’s passport, requiring them to place their thumb on the reader before the gantry gate opens.

Get 20% OFF The Star Digital Access

Monthly Plan

RM 13.90/month

RM 11.12/month

Billed as RM 11.12 for the 1st month, RM 13.90 thereafter.

Best Value

Annual Plan

RM 12.33/month

RM 9.87/month

Billed as RM 118.40 for the 1st year, RM 148 thereafter.

Follow us on our official WhatsApp channel for breaking news alerts and key updates!

Next In Nation

Mobile users receive emergency alerts as nationwide MySiren test begins
Take STEM more seriously, GPS' Sagah urges parents and children
Sarawak polls: Tebedu border complex works under way, clinic approved, says GPS' Simon
Sarawak polls: Race-based politics hard for Sarawakians to accept, says GPS candidate Martin Ben
From runways to train tracks: Two ex-flight attendants take on new challenge as ECRL crew members
East Sabah blackout: T313 tower bank protection works carried out in March before collapse
Double KL rallies held peacefully
Highways get 690 solar streetlights
Social media misuse, 3R issues on police radar
Candidate steps aside after Abang Jo’s assurances

Air Pollutant Index

Note: API is calculated based on 24hr running average of the most dominant parameter.

Highest API Readings

    Select State and Location to view the latest API reading

    Others Also Read