Baling floods: Two water treatment plants shut down


ALOR SETAR: The operations of the Kulim Hi-Tech Park Water Treatment Plant (LRA) and the Bukit Pinang/Sungai Petani LRA had to be suspended due to high raw water turbidity (Nephelometric Turbidity unit,) as a result of the floods and water surge phenomenon in Baling on Monday (July 4).

Kedah Mentri Besar Datuk Seri Muhammad Sanusi Md Nor (pic) in a post on his Facebook on Wednesday (July 6) said that the two LRAs were fully shut down at 10.50pm and 11.10pm Tuesday (July 5).

Get 20% OFF The Star Digital Access

Monthly Plan

RM 13.90/month

RM 11.12/month

Billed as RM 11.12 for the 1st month, RM 13.90 thereafter.

Best Value

Annual Plan

RM 12.33/month

RM 9.87/month

Billed as RM 118.40 for the 1st year, RM 148 thereafter.

Follow us on our official WhatsApp channel for breaking news alerts and key updates!

Next In Nation

PM Anwar congratulates Malaysian contingent on nine-gold haul at Asian Games
DKU reaffirms Tuanku Muhriz remains Yang Dipertuan Besar of Negri Sembilan
I want justice for my daughter, says Fiya's father
Cockfighting gambling syndicate busted with 41 nabbed in Batu Gajah
Junz Wong elected Putatan Warisan chief
UiTM difficulties must not drag us down, but push us to be better, says Zambry
Cost among various aspects to be considered before decision to bring back F1 to Malaysia, says PM Anwar
Melaka polls: Talks on cooperation with 'rival party' almost complete, says BN chief
No water found in RON95 petrol from Batu Kawan station
Sultan of Brunei concludes special visit to Malaysia

Others Also Read