No warning sign despite check on rail tracks


KOTA KINABALU: A sweep of the railway tracks just 25 minutes before Wednesday’s deadly train plunge into the Padas River in the interior had found nothing amiss.

“It is a very unfortunate incident. Our men did not see any warning signs of instability that indicated an imminent collapse of the tracks along the river bank,” Sabah Railway Department director James Wong said yesterday.

He said that technicians had done the daily routine maintenance checks along the rail tracks between 2.35pm and 2.50pm and found no indication that the riverbank would collapse hardly 30 minutes later.

Two people were killed and four others injured among the 41 people on board a locomotive and two carriages that plunged 10m into the river when the rail tracks collapsed in a landslip at the riverbank in Kampung Pangi area near Tenom here at 3.15pm.

A ‘railcar’: An old mini-locomotive carrying Sabah Railway Department workers and Kampung Rayoh residents to Tenom town on Friday as an alternative form of transport following the accident. — Bernama

Wong said works were under way to repair and shift the tracks further way from the Padas riverbanks. They were also fishing out the carriages and the locomotive from the fast flowing river.

“We managed to remove one of the carriages on Friday and are hoping to take out the second carriage and locomotive from the river in the next few days,” he said, adding that they were using an excavator to winch it out.

However, rail operations were not totally stopped. In the last two days, a “railcar” ran the 20km stretch between Kg Rayoh to Beaufort to send students to Beaufort.

“The train is the only mode of transport for these students, we have to provide this temporary service,” he said, adding that the tracks would be totally closed for two days sometime next week for intensive checks on the rails between Beaufort and Tenom.

Sabah’s 134km railway track is the only one in Borneo. A section of the tracks were closed from Kota Kinablu to Beaufort for major upgrading since last year.

Get 20% OFF The Star Digital Access

Monthly Plan

RM 13.90/month

RM 11.12/month

Billed as RM 11.12 for the 1st month, RM 13.90 thereafter.

Best Value

Annual Plan

RM 12.33/month

RM 9.87/month

Billed as RM 118.40 for the 1st year, RM 148 thereafter.

Follow us on our official WhatsApp channel for breaking news alerts and key updates!

Next In Nation

Rising prices of essentials becoming unbearable, says Dr Wee
Release Tabung Haji RCI report for transparency and fairness, says Fahmi
Education, welfare key to empowering Indian community, says Anwar
Malaysian passport remains world's 7th most powerful
Govt to crack down on imports of non-compliant, unsafe electrical products
Deputy IGP Ayob Khan not ready to stop writing yet
Negri polls: Pakatan's attacks on BN-PN understanding just a distraction, says BN Youth comms director
Extremists using online games to recruit members, says Deputy IGP
Malaysia reaffirms stance on Israel to US govt, says Tok Mat
Malaysia's stance against Israel a principled one against genocide, not antisemitic, says US don

Others Also Read