Malaysian architect on common issues found in adaptive reuse


The main seminar hall of the South Wing at the Penang Institute after transformation. Photos: BETA

Welcome back to my series of practical tips and experience-sharing on adaptive reuse.

Today, we’ll discuss some of the most common issues found in old vacant buildings.

Get 20% OFF The Star Digital Access

Monthly Plan

RM 13.90/month

RM 11.12/month

Billed as RM 11.12 for the 1st month, RM 13.90 thereafter.

Best Value

Annual Plan

RM 12.33/month

RM 9.87/month

Billed as RM 118.40 for the 1st year, RM 148 thereafter.

Follow us on our official WhatsApp channel for breaking news alerts and key updates!

Next In Living

Heart And Soul: The privilege of feeling everything
How to choose a dog daycare and walker for your pet's comfort and safety
How East Malaysian restaurants in KL are increasing awareness about Borneo cuisine
This Sesame-Cumin Chicken is double-fried for flavour and crispiness
LA Chinatown elders need groceries – these teens go door-to-door delivering them
Ice kacang gets a cool sneaker tribute in latest Asics and Sneakerlah collab
Heart And Soul: A cat, an elephant and a dog
Tooth study shows T. Rex was warmblooded, with human-like temperature
Struggling Cuban chefs hold out for a brighter tomorrow by turning to locals
Why Gen Z feels lonely despite being digitally connected

Others Also Read