Sarawak Premier Tan Sri Abang Johari Tun Openg
KUCHING: Bintulu’s power generation capacity will be tripled to 1.5 gigawatts (GW) from the existing 500 megawatts (MW) to cope with the rising energy demand in its rapid industrial development.
A new 500MW gas-powered plant is currently in construction under Sarawak Gas Roadmap to double the power generating capacity, according to Sarawak Premier Tan Sri Abang Johari Tun Openg.
