KUALA LUMPUR: Boustead Penang Shipyard Sdn Bhd (BPS) has completed the load out and sail away of the offshore Belum Topsides (BE-SA) facilities for Murphy Sarawak Oil Co Ltd.
The BE-SA facilities will be utilised in Murphy's Sarawak Gas Development Project (SGDP), a multi-phase for several natural gas discoveries in blocks SK309 and SK311, which started production in 2009.
Already a subscriber? Log in
Save 30% OFF The Star Digital Access
Cancel anytime. Ad-free. Unlimited access with perks.
