Thai airport rail link resumes full service after disruption


BANGKOK: Airport Rail Link services between Phaya Thai and Suvarnabhumi stations returned to normal at 10.07pm on Wednesday (July 22), after engineers resolved a fault that had disrupted operations throughout the day.

The State Railway of Thailand (SRT), SRT Electrified Train Company and Asia Era One announced that normal services had resumed after specialists inspected a track switch at the turnback point inside the Khlong Tan maintenance depot.

Teams also successfully cleared a train that had been obstructing access to and from the Airport Rail Link system, allowing regular operations to restart across the full route.

SRT governor Anan Phonimdeang said the railway had been instructed by the deputy transport minister to co-ordinate with all relevant agencies and restore services as quickly as possible.

Rail-system specialists from public agencies and private companies were mobilised throughout the day to address the disruption, enabling the line to resume normal operations by late evening.

However, the SRT, SRT Electrified Train Company and Asia Era One will continue a detailed technical investigation to determine the precise cause of the fault.

Asia Era One said the track-switch assembly had been inspected and repaired in strict accordance with operational safety standards under the SRT’s supervision.

The company plans to replace the switch assembly at the depot’s turnback point and assess possible improvements to that area and other locations considered vulnerable to similar problems.

It will also review its contingency timetable and backup operating plans to reduce the risk of another disruption and maintain passenger confidence in Airport Rail Link services.

The operator stressed that the incident had not compromised passenger safety.

Airport Rail Link normally operates daily from 5.30am until midnight. The first trains leave both Phaya Thai and Suvarnabhumi stations at 5.30am, while the final services depart at midnight. The operator’s published service information also lists its regular operating hours as 5.30am to midnight.

Six trains are scheduled for regular operations, with two additional trains available to meet heavier passenger demand during peak periods. - The Nation/ANN

 

 

Follow us on our official WhatsApp channel for breaking news alerts and key updates!

Next In Aseanplus News

Eight pilgrims from India's Madhya Pradesh killed, 17 injured as mini bus falls into gorge in Kota district
Man seriously injured in Japan's Akita Prefecture with wife reporting bear attack
Woman arrested for drink driving after accident in Singapore's Amoy Street; two people taken to hospital
Laos hosts regional exchange on flood forecasting to strengthen disaster preparedness
Asean News Headlines at 10pm on Saturday (Oct 17, 2026)
Hong Kong police ramp up investigation into Anita Mui’s missing ashes with unit upgrade
Selfies, queues and confusion, but Huanggang Port’s wow factor shines through
Indonesia missing out on sports tourism boom as Mandalika extension in limbo
India's Gujarat pharmaceutical plant blast kills five workers, six injured after reactor explosion
Brunei non-oil, gas sector contribution to GDP rises to 55% in 10 years: minister

Others Also Read