VIENTIANE:The groundbreaking ceremony for the 230 kV Thavieng-Mahaxay power transmission and transformation project, along with the second year anniversary of operation of the Electricite du Laos Transmission Company Limited (EDL-T), was held in the Lao capital Vientiane recently.
Operated by the EDL-T, a joint venture of China Southern Power Grid (CSG) and Lao state-run Electricite du Laos (EDL), the Thavieng-Mahaxay project is expected to strengthen the power grid structure linking northern and central Laos as well as improve electricity transmission efficiency and system stability upon completion.
