Hopeful for amicable solution in MRT2 underground construction


Pictures taken from Star Radio Traffic Twitter page

I HAVE been in the construction line since I graduated from university and started my career in tunnelling. Hence, the ongoing wrangle between MMC-Gamuda and the Finance Ministry has caught my attention. I was among a few Malaysians who were fortunate enough to be involved in the final stages of building the Channel Tunnel during our stint in London. We thought we were lucky to be involved in tunnel design as it was a very specialised field and there were not many tunnels being built in Malaysia at that time.

As our nation progressed from the 1980s till now, we have seen tunnels being built using boring machines for the Stormwater Management And Road Tunnel (SMART Tunnel), MRT, Sprint Highway and Rasa Water Treatment Plant mainly by one company – Gamuda.

Get 20% OFF The Star Digital Access

Monthly Plan

RM 13.90/month

RM 11.12/month

Billed as RM 11.12 for the 1st month, RM 13.90 thereafter.

Best Value

Annual Plan

RM 12.33/month

RM 9.87/month

Billed as RM 118.40 for the 1st year, RM 148 thereafter.

Follow us on our official WhatsApp channel for breaking news alerts and key updates!

Next In Letters

BN Negri keeps its word: No residential assessment rate hike for five years
Maids should be treated with respect and dignity��
Is AI a cheating tool or study buddy?
Make haste before air quality deteriorates further
The dark side of going viral
Your bill went up. The tariff did not. Here is what actually happened
Targeted subsidies: A bitter pill today, but better protection tomorrow
Malaysia needs stronger labour rights protection
What we need to protect our borders better
Drug testing must be fair, difficult to tamper with

Others Also Read