THE committee of a 50-year-old Hindu temple near the Sultan Abdul Aziz Shah Airport (LTSAAS), which has been affected by flood and soil erosion from a project next door, wants long-term solutions to resolve the problem.
“The temple’s drainage and outlets were clogged and completely covered after soil was brought in to raise the land at the project site,” said Kuil Sri Maha Mariamman committee vice-chairman P. Dhandapani, adding that the project belonged to Malaysia Airports Holdings Bhd (MAHB).
Already a subscriber? Log in
Play, subscribe and stand a chance to win prizes worth over RM39,000! T&C applies.
Cancel anytime. Ad-free. Unlimited access with perks.
