‘No cost overruns at KLIA2’


At The DEWAN RAKYAT

KLIA2 did not experience cost overruns although costs had ballooned from RM1.7bil to RM4bil, the Transport Ministry said.

In a written reply to Ariff Sabri Abdul Aziz (DAP-Raub), the ministry said the project never experienced cost overruns.

Get 20% OFF The Star Digital Access

Monthly Plan

RM 13.90/month

RM 11.12/month

Billed as RM 11.12 for the 1st month, RM 13.90 thereafter.

Best Value

Annual Plan

RM 12.33/month

RM 9.87/month

Billed as RM 118.40 for the 1st year, RM 148 thereafter.

Follow us on our official WhatsApp channel for breaking news alerts and key updates!
News , bureaus

Next In Nation

RM500,000 set aside for development projects in Kg Guar Petai
Floods: Evacuee numbers up in S'gor, down in Perak, unchanged in Sabah
UKM student believed missing for five weeks, sister fears for his safety
Company director loses almost RM130K in college tender scam
M'sia to set up special panel ahead of regional haze chairmanship
Motorcyclist killed in crash on NSE near Kulai
Enhanced checks at KLIA foil attempts to smuggle RM34.89mil worth of drugs, says Home Minister
Probe of former spy chief’s letter to CIA classified as NFA, Parliament told
Three-phase security plan to curb drug trafficking at KLIA, other int'l entry points
One dead, one injured in accident linked to cable theft in Iskandar Puteri

Air Pollutant Index

Note: API is calculated based on 24hr running average of the most dominant parameter.

Highest API Readings

    Select State and Location to view the latest API reading

    Others Also Read