At The DEWAN RAKYAT
KLIA2 did not experience cost overruns although costs had ballooned from RM1.7bil to RM4bil, the Transport Ministry said.
In a written reply to Ariff Sabri Abdul Aziz (DAP-Raub), the ministry said the project never experienced cost overruns.
Already a subscriber? Log in
Play, subscribe and stand a chance to win prizes worth over RM39,000! T&C applies.
Cancel anytime. Ad-free. Unlimited access with perks.
