Search


You have searched for "MMC Gamuda KVMRT"

Showing 1-10 of 22

Sort by: Newest | Oldest | Relevance


Community

Gamuda assists in east coast clean-up

TO ALLEVIATE the plight of flood victims in the east coast, MMC-Gamuda Joint Venture mobilised manpower from its Tunnelling Training Academy (TTA) and heavy equipment to help clean up hard-hit areas.

Community

Syabas: Sinkhole caused by earth movement at MRT construction site

Burst pipe was not the reason for road depression

Community

Syabas: Sinkhole not caused by burst pipe

Syarikat Bekalan Air Selangor (Syabas) claims earth movement at a MRT construction site caused the sinkhole in Bukit Bintang.

Community

Adverse effects of construction works

OWNERS of shops along Jalan Cheras Batu 3 are unhappy with the construction works in front of their premises that are causing cracks in their buildings, among other damages.

Community

Public can inspect proposed Sungai Buloh-Serdang-Putrajaya MRT alignment until Aug 17

The public display is a requirement under Section 84 of the Land Public Transport Act 2010.

Community

Roadshows to seek public feedback on MRT route

PUBLIC inspection of the MRT Sungai Buloh–Serdang–Putrajaya Line (SSP Line) will begin today and the relevant documents will be displayed until Aug 17.

Community

Bad roads near school to be fixed within a week

DAMAGED inner lanes outside SJK(T) Saraswathy Sungai Buloh off Jalan Hospital will be resurfaced within a week and adequate road signage installed for the safety of road users.

Community

Part of Sprint closed tomorrow to facilitate the construction of link bridge

MAJOR road closures will be taking place on two Sundays – on Sept 6 and 13, totalling 18 hours – along the Sprint Highway at KM3.6.

Community

Closure to make way for MRT works

Motorists using the Sprint Highway near Phileo Damansara are advised to be mindful of road closures in the area from today until Nov 6 from 10pm to 6am.

Community

Road closure outside Phileo Damansara to begin tonight

A road closure which was scheduled to start on Sept 22 along Jalan 16/11 outside Phileo Damansara has been postponed to today.