Chinese-funded power project provides main energy source for Zimbabwe in 2024: regulator


  • World
  • Saturday, 28 Jun 2025

HARARE, June 27 (Xinhua) -- The Chinese-funded Hwange Thermal Power Station Unit 7 and Unit 8 project is the main energy supply source for Zimbabwe in 2024, the Zimbabwe Energy Regulatory Authority (ZERA) said on Friday.

ZERA said in its 2024 annual report that a total of 11,082 gigawatt-hours (GWh) was delivered into the country's transmission system in 2024, up from 10,096 GWh in 2023.

Follow us on our official WhatsApp channel for breaking news alerts and key updates!

Next In World

Kosovo votes in bid to end year-long political impasse
At least 15 dead, 19 injured in Guatemala bus accident
Brazil's former President Bolsonaro has surgery to treat hiccups, wife says
Myanmar polls open amid civil war, junta-backed party tipped to win
Storm causes runway incidents at Finland's Kittila Airport, no injuries
Libya honors late army chief as bodies repatriated from T�rkiye
Head of German Medical Association calls for ban on private fireworks over safety, environmental concerns
Italy loosens court control over public tenders, amid protests
Taiwan rattled by 7.0 magnitude quake, no major damage reported
Asia-Pacific rides AI boom to unlock tech-empowered growth, cooperation momentum in 2025

Others Also Read