Selangor dams levels sufficient for up to six months of hot, dry Southwest Monsoon, says exco member


SHAH ALAM: Water levels in all seven dams in Selangor are above 95% and are expected to last for another three to six months, said Selangor infrastructure and agriculture committee chairman Datuk Izham Hashim.

He said, despite the ongoing hot and dry weather due to the Southwest Monsoon, dam water levels are expected to remain stable in the coming months.

He said that the Southwest Monsoon, which began on May 10 and is expected to continue until September, typically brings low humidity and reduced rainfall in most areas.

"However, dam water levels can be replenished during the monsoon transition period in October, and the Northeast Monsoon from November to March, when high rainfall is expected in the catchment areas," he said in a statement Friday (June 27).

Izham added that Lembaga Urus Air Selangor (Luas) has identified additional ponds and former mining sites near major rivers, which are suitable for upgrading with water supply infrastructure to boost raw water storage capacity.

"These ponds are branded under the Selangor Off-River Storage Scheme (SORSS), which involves over 100 ponds and several former mining sites," he said.

Elaborating further, Izham said that the development of the SORSS will help optimise the use of alternative water sources, with its current supply capacity lasting up to three months.

"Overall, the readiness of the state's water resources, including dam capacity and SORSS development, is estimated to last up to nine months, to withstand the Southwest Monsoon," he said.

Izham added that Luas is also maximising the use of groundwater as an alternative to treated water, particularly for the industrial sector, through licensing and water abstraction charges. Three groundwater wells have been built in Hulu Selangor for use, especially during the dry season.

In terms of water quality, Izham said that the Zero Discharge Policy (ZDP), implemented through the Licensing Regulations for the Discharge of Return Water and the Entry or Release of Waste Materials and Pollutants 2024, is actively being enforced and helps minimise pollution of water resources.

"To date, there have been no recorded disruptions to the state's water treatment plant operations, caused by industrial pollution of water resources," he said. - Bernama

Follow us on our official WhatsApp channel for breaking news alerts and key updates!

Next In Nation

MyEG hit with additional RM353.13mil income tax assessment, civil suit by government
Floods: Perak latest state to be hit, one relief centre opened in Kerian
Immigration busts RM6mil online scam syndicate, 64 foreigners nabbed
(Podcast) Poll Position: Sarawak politics 101
Future of Malaysia outweighs political differences, says Anwar on Bersatu signing CSA
Heavy rain causes Kulai road to collapse
Dewan Rakyat passes Supply Bill 2027 at policy stage
Almost nine in 10 motorists exceed speed limit on Persiaran Mokhtar Dahari, JKR study finds
HR Ministry continues to prioritise job opportunities for locals, says Ramanan
Johor govt rejects claims linking JCorp to Indonesian fires

Air Pollutant Index

Note: API is calculated based on 24hr running average of the most dominant parameter.

Highest API Readings

    Select State and Location to view the latest API reading

    Others Also Read