KUALA LUMPUR: The SMART Tunnel resumed operations after being closed for over two hours following heavy rain in the Klang Valley since 5 pm.
The SMART Stormwater Control Centre (SMART SCC) said in a statement on Saturday (Dec 10) night that the system had returned to Mode 2b and the traffic tunnel was reopened at 9.30 pm, followed by Mode 1 status at 10.10 pm.
Unlock 30% Savings on Ad-Free Access Now!
