Call to scrap proposed road


Troubled spot: Aerial view of Jalan Lembah Permai in Tanjung Bungah, where the North Coastal Paired Road from Teluk Bahang will end in the L-shaped bend of the road.

GEORGE TOWN: Tanjung Bungah residents want the proposed new road from Teluk Bahang to their neighbourhood scrapped after realising it entails deforestation and construction on slopes with gradients steeper than 25 degree.

Through the Tanjung Bungah Residents Association (TBRA), 400 of them signed a petition against the North Coastal Paired Road (NCPR).

TBRA chairman Meenakshi Raman said the environmental impact assessment (EIA) showed that 3.34ha of gazetted forest reserve will be cleared for the road.

“Tracts of the Teluk Bahang Forest Reserve and Bukit Kerajaan Forest Reserve will be deforested. How can this be allowed?” Meenakshi said during a press conference at the Tanjung Bungah market yesterday.

She said the EIA revealed that 46% of the proposed road would be on slopes with gradients higher than 25 degrees.

“The EIA is clear that slope instability risks will be high. Mitigation measures are suggested, but haven’t we learnt enough about Penang’s development? The island is sensitive to landslides,” she said.

The residents urged the Department of Environment (DoE) in writing not to approve the EIA. A copy of the letter was also forwarded to Chief Minister Lim Guan Eng on Aug 21.

The NCPR is a 10.53km four-lane road that is part of the Penang Transport Master Plan and is under the purview of Consortium Zenith Construction. It is part of the traffic dispersal system of the Penang Undersea Tunnel project.

The residents are also confounded by the cost. Meenakshi said in 2011, the estimated construction cost and land acquisition cost of the NCPR was RM1bil.

She felt the EIA should have included a cost-to-benefit analysis and “for RM1bil, can’t we think of other alternatives to the traffic problem?”

In response, state exco member Lim Hock Seng clarified that the clearing of the forest reserves was studied in the EIA as a requirement, but the state is planning to avoid it.

“The first phase of NCPR is from Batu Ferringhi to Tanjung Bungah. The Teluk Bahang stretch, where the forest reserves are, won’t happen so soon.

“Although it is studied in the EIA, we do plan to continue examining alternatives and avoid deforestation,” said Lim.

Get 20% OFF The Star Digital Access

Monthly Plan

RM 13.90/month

RM 11.12/month

Billed as RM 11.12 for the 1st month, RM 13.90 thereafter.

Best Value

Annual Plan

RM 12.33/month

RM 9.87/month

Billed as RM 118.40 for the 1st year, RM 148 thereafter.

Follow us on our official WhatsApp channel for breaking news alerts and key updates!

Next In Nation

Negri polls: Anwar to campaign at four locations on July 22
Man found dead on Bukit Maras summit
Malaysia's new high commissioner to Singapore presents credentials to president Tharman
Speed testing vehicles on public roads can lead to legal action
KL Education Dept to take legal action over viral student brawl
Foreign worker electrocuted while installing lamp post
PAS-Umno cooperation necessary to reinforce Malay Muslim political power, says Hadi
Independent candidate in Negri polls to be charged over social media post
Kajang murder probe: Cops nab five suspects
MACC arrests Sabah NGO chief over misuse of RM2mil

Others Also Read