MANY may think that the upgrading works of the Damansara-Puchong Highway (LDP), Taman Tun Dr Ismail (TTDI) interchange have come to a halt, but concessionaire Lingkaran Trans Kota Sdn Bhd (Litrak) reiterated that construction is on-going.
The work resumed on Aug 15 after a five-month delay caused by an issue with the Petaling Jaya City Council (MBPJ) over the land next to the concessionaire’s right-of-way (ROW).
