Extra drains being built to alleviate flash floods in Taman Menjalara


By CY LEE

One of the two rainwater diversion channels under construction in Jalan 1/62B in Taman Menjalara to prevent flash floods that have damaged roads near a roundabout during heavy rain.

TWO rainwater diversion drains are being built in Jalan 1/62B Taman Menjalara, Kuala Lumpur to prevent flash floods at a nearby roundabout.

Kuala Lumpur City Hall (DBKL) is building the drains on both sides of the road to funnel rainwater into nearby drains.

Limited time offer:
Just RM5 per month.

Monthly Plan

RM13.90/month
RM5/month

Billed as RM5/month for the 1st 6 months then RM13.90 thereafters.

Annual Plan

RM12.33/month

Billed as RM148.00/year

1 month

Free Trial

For new subscribers only


Cancel anytime. No ads. Auto-renewal. Unlimited access to the web and app. Personalised features. Members rewards.
Follow us on our official WhatsApp channel for breaking news alerts and key updates!
   

Next In Metro News

Assessment hike capped at 25% for unaltered properties in Ampang Jaya
Setiawangsa eateries face the music for blocking common areas
Savour steamed meat noodles in Puchong
Pop-up display of precision watches
Time to spread kindness
Teaching aquaculture skills to B40
Next phase of development launched in Pekan Nenas
Project to build ICT skills among Orang Asli wins global award
300 stray dogs neutered in Langkawi so far
Shining spotlight on supermums

Others Also Read