Contractor to fix road, houses damaged by pipe installation


Persiaran Mahkota Cheras 1 is riddled with potholes because of the water treatment plant project.

A MAIN road and several houses in Bandar Mahkota Cheras damaged by ongoing works for the Langat 2 water treatment plant and distribution facility (LRAL2) will be repaired, next month.

The affected road is Persiaran Mahkota Cheras 1 in Cheras, while 12 houses suffered cracks due to construction work attributed to the project, specifically the package to instal main water pipes from the Bukit Enggang balancing reservoir to Sungai Besi Expressway.

Limited time offer:
Just RM5 per month.

Monthly Plan

RM13.90/month
RM5/month

Billed as RM5/month for the 1st 6 months then RM13.90 thereafters.

Annual Plan

RM12.33/month

Billed as RM148.00/year

1 month

Free Trial

For new subscribers only


Cancel anytime. No ads. Auto-renewal. Unlimited access to the web and app. Personalised features. Members rewards.
Follow us on our official WhatsApp channel for breaking news alerts and key updates!
   

Next In Metro News

Assessment hike capped at 25% for unaltered properties in Ampang Jaya
Setiawangsa eateries face the music for blocking common areas
Savour steamed meat noodles in Puchong
Pop-up display of precision watches
Time to spread kindness
Teaching aquaculture skills to B40
Next phase of development launched in Pekan Nenas
Project to build ICT skills among Orang Asli wins global award
300 stray dogs neutered in Langkawi so far
Shining spotlight on supermums

Others Also Read