Sidek (second from left) presenting a souvenir to Mohamed Khaled (left) at the launch of PCP and RGT2 in Pengerang.
PENGERANG: The Pengerang Integrated Complex (PIC), developed within the multi-billion ringgit Pengerang Integrated Petroleum Complex (PIPC), has achieved a 77% completion rate as of September.
Petronas president and group chief executive officer Tan Sri Wan Zulkiflee Wan Ariffin said the development was on schedule.
